I work in a three-person architecture practice in Auckland. I'm rebuilding how our projects run and how the office runs behind them. I build the workflows, run the adoption, and track whether it sticks. Empowering the team to feel confident on the tools is where I thrive. 11 agents, equipped with their own tools and skills, work across every job we take on and take care of high friction admin.

The build isn't why it's still running four months later.

This case study follows one task in detail the whole way through once we identified it as worth doing. From the conversation where we found it, to why it stuck. I've laid out the process against the seven steps I use for any adoption.

The case study problem:

Every project takes typically one hour to get a legal property boundary out of the national land database (LINZ) and into the software we design in.

THE SEVEN STEPS OF ADOPTION

Identify · Redesign · Verify · Embed · Champion · Measure · Lead

THE SEVEN STEPS OF ADOPTION

Identify · Redesign · Verify · Embed · Champion · Measure · Lead

THE BUILT SYSTEM TO-DATE

THE ENTIRE BUILT SYSTEM IN ONE DIAGRAM

AGENTIC ARCHITECURE
STUDIO

Implementation and Adoption case study

Implementation and Adoption case study

CONNECTORS

GMAIL

COuncil APIS

INFRASTRUCTURE APIS

Fire flies



RE-THINKING THE FUTURE OF THE STUDIO

I work in a three-person architecture practice in Auckland. I'm rebuilding how our projects run and how the office runs behind them. I build the workflows, run the adoption, and track whether it sticks. Bringing the people around me along and empowering them. Eleven agents, equipped with their own tools and skills, now work across every job we take on and eat the high friction admin nobody wanted.

The build isn't why it's still running four months later.

This case study follows one task in detail the whole way through once we identified it as worth doing. From the conversation where we found it, to why it stuck. I've laid out the process against the seven steps I use for any adoption.

The case study problem:

Every project it takes typically an hr to get a site's legal boundaries out of the national land database (LINZ) and into the software we design in.

THE SEVEN STEPS OF ADOPTION

Identify · Redesign · Verify · Embed · Champion · Measure · Lead

THE ENTIRE BUILT SYSTEM IN ONE DIAGRAM

AGENTIC ARCHITECUTRE STUDIO

Implementation and Adoption case study

RE-THINKING THE FUTURE OF THE STUDIO

I work in a three-person architecture practice in Auckland. I'm rebuilding how our projects run and how the office runs behind them. I build the workflows, run the adoption, and track whether it sticks. Bringing the people around me along and empowering them. Eleven agents, equipped with their own tools and skills, now work across every job we take on and eat the high friction admin nobody wanted.

The build isn't why it's still running four months later.

This case study follows one task in detail the whole way through once we identified it as worth doing. From the conversation where we found it, to why it stuck. I've laid out the process against the seven steps I use for any adoption.

The case study problem:

Every project it takes typically an hr to get a site's legal boundaries out of the national land database (LINZ) and into the software we design in.